Guide · Des Moines, IA
How to care for a new concrete driveway
Updated November 2026
A driveway’s first month and first winter have a lot to do with how it looks in year twenty.
Short answer
Keep foot traffic off for about a day and vehicles off for about a week, longer for heavy trucks. Concrete keeps gaining strength for weeks, with 28 days as the standard benchmark. Seal it when your crew recommends, avoid de-icing salts the first winter, and never use products containing ammonium nitrate or ammonium sulfate, which attack concrete.
The first month
- Day 1–2: stay off; keep pets and bikes off too.
- About a week: passenger cars are usually fine. Follow your crew’s guidance.
- First month: keep heavy trucks, dumpsters and trailers off. Avoid parking in the same spot near the edges.
Sealing
A penetrating sealer helps resist water and salt. Timing depends on the product and the season. Reapply every few years or as recommended.
Want a real number for your concrete project? We call back within one business day, usually sooner.
Call (515) 762-6821Leave a message with your name, number and project. We call back within one business day.
Winter
- No de-icers the first winter; use sand.
- After that, use them sparingly and avoid fertilizer-based products.
- Clear snow early; use a plastic shovel or keep plow blades slightly raised.
- Rinse off road salt that drips from cars in the garage approach when the weather allows.
Questions
Why is my new concrete different shades?
Color can vary as concrete cures and dries, and usually evens out over weeks to months.
Are hairline cracks in new concrete normal?
Small shrinkage cracks can happen. Control joints are placed to guide where cracking occurs. Wider or offset cracks should be looked at.